New 2026 self‑consumption subsidies are open · We handle the paperwork

New electrical service connection for a private home – Sant Lorenzo

The project

What we did.

New electrical supply – Turnkey project

Complete installation of a new electrical service connection, including trench excavation and reinstatement, underground conduits, inspection chambers, cable installation, individual service line and overhead utility connection.

The works also included modifications to the electrical installation, testing and measurements, preparation of drawings, certification and all necessary paperwork with Endesa and the relevant industry authority prior to final energisation.

A turnkey project covering the entire process, from civil works to the final connection and certification of the electrical supply.

Gallery

The project in pictures.

A project similar to yours?

Tell us what you need. Free on‑site technical visit anywhere on the island and fixed quote within 5 working days.

Subsidies and grants

In accordance with the public call for grants BOIB no. 96 of 22 July 2025 for the scrapping of the most polluting vehicles under the sustainable tourism tax (ITS20242025-068), MEDORI ELECTRICIDAD SL has scrapped a vehicle over ten years old with the support of the Illes Balears sustainable tourism tax.

Illes Balears Sostenibles Govern de les Illes Balears

This project is part of the Efficient and Sustainable Mobility Incentives Programme (MOVES III), funded by the Ministry for the Ecological Transition and the Demographic Challenge and managed in the Illes Balears by the Govern Balear.

MOVES III 2025